Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 21 results ...

Adeleye, T, Huang, M, Huang, Z and Sun, L (2013) Predicting Loss for Large Construction Companies. Journal of Construction Engineering and Management, 139(09), 1224–36.

Alsamadani, R, Hallowell, M R, Javernick-Will, A and Cabello, J (2013) Relationships among Language Proficiency, Communication Patterns, and Safety Performance in Small Work Crews in the United States. Journal of Construction Engineering and Management, 139(09), 1125–34.

Cruz, C O and Marques, R C (2013) Exogenous Determinants for Renegotiating Public Infrastructure Concessions: Evidence from Portugal. Journal of Construction Engineering and Management, 139(09), 1082–90.

Damci, A, Arditi, D and Polat, G (2013) Multiresource Leveling in Line-of-Balance Scheduling. Journal of Construction Engineering and Management, 139(09), 1108–16.

Franz, B W, Leicht, R M and Riley, D R (2013) Project Impacts of Specialty Mechanical Contractor Design Involvement in the Health Care Industry: Comparative Case Study. Journal of Construction Engineering and Management, 139(09), 1091–7.

Hanna, A S, Thomas, G and Swanson, J R (2013) Construction Risk Identification and Allocation: Cooperative Approach. Journal of Construction Engineering and Management, 139(09), 1098–107.

Hegazy, T, Abdel-Monem, M, Saad, D A and Rashedi, R (2013) Hands-On Exercise for Enhancing Students’ Construction Management Skills. Journal of Construction Engineering and Management, 139(09), 1135–43.

  • Type: Journal Article
  • Keywords: Construction management; Scheduling; Project management; Training; Engineering education; Students; Education-practice interchange; Internships; Construction management; Scheduling; Project control; Training; Progress tracking; Professional issues; Educat
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000705
  • Abstract:
    This paper presents a hands-on exercise on construction project management to augment traditional teaching methods and help students improve their construction experience and project management skills. The exercise involved 100 students participating in managing and constructing a 3.8-m (12.5-ft) model of Canada’s CN Tower within a 30-min deadline. Before construction, the groups prepared method statements, cost estimates, and schedules for constructing the model. During construction, the groups had to manage limited resources, procurement challenges, and forced interruptions to keep the project on track. To experience new project-tracking methods, students were introduced to a voice-based prototype for collecting progress information and automatically updating the schedule. The results indicate that students gained better understanding of the real construction environment and how to apply their acquired construction management skills to handle the involved complexities and interdependencies. The paper can be of interest mainly to researchers and educators. It presents the design, planning, and implementation of this educational exercise and discusses its practicality and ability to enhance the project management skills of students.

Hollar, D A, Rasdorf, W, Liu, M, Hummer, J E, Arocho, I and Hsiang, S M (2013) Preliminary Engineering Cost Estimation Model for Bridge Projects. Journal of Construction Engineering and Management, 139(09), 1259–67.

Jafari, A and Love, P E D (2013) Quality Costs in Construction: Case of Qom Monorail Project in Iran. Journal of Construction Engineering and Management, 139(09), 1244–9.

Jin, Z, Deng, F, Li, H and Skitmore, M (2013) Practical Framework for Measuring Performance of International Construction Firms. Journal of Construction Engineering and Management, 139(09), 1154–67.

Li, J, Chiang, Y H, Choi, T N Y and Man, K F (2013) Determinants of Efficiency of Contractors in Hong Kong and China: Panel Data Model Analysis. Journal of Construction Engineering and Management, 139(09), 1211–23.

Liu, J Y, Zou, P X W and Gong, W (2013) Managing Project Risk at the Enterprise Level: Exploratory Case Studies in China. Journal of Construction Engineering and Management, 139(09), 1268–74.

Marzouk, M and Amin, A (2013) Predicting Construction Materials Prices Using Fuzzy Logic and Neural Networks. Journal of Construction Engineering and Management, 139(09), 1190–8.

Menesi, W, Golzarpoor, B and Hegazy, T (2013) Fast and Near-Optimum Schedule Optimization for Large-Scale Projects. Journal of Construction Engineering and Management, 139(09), 1117–24.

Shahandashti, S M and Ashuri, B (2013) Forecasting {[}Engineering News-Record{]} Construction Cost Index Using Multivariate Time Series Models. Journal of Construction Engineering and Management, 139(09), 1237–43.

Sunindijo, R Y and Zou, P X W (2013) Conceptualizing Safety Management in Construction Projects. Journal of Construction Engineering and Management, 139(09), 1144–53.

Tas, E, Cakmak, P I and Levent, H (2013) Determination of Behaviors in Building Product Information Acquisition for Developing a Building Product Information System in Turkey. Journal of Construction Engineering and Management, 139(09), 1250–8.

Wang, S, Tang, W and Li, Y (2013) Relationship between Owners’ Capabilities and Project Performance on Development of Hydropower Projects in China. Journal of Construction Engineering and Management, 139(09), 1168–78.

Xie, J and Thomas Ng, S (2013) Multiobjective Bayesian Network Model for Public-Private Partnership Decision Support. Journal of Construction Engineering and Management, 139(09), 1069–81.

Yorucu, V (2013) Construction in an Open Economy: Autoregressive Distributed Lag Modeling Approach and Causality Analysis—Case of North Cyprus. Journal of Construction Engineering and Management, 139(09), 1199–210.

Zhao, X, Hwang, B and Low, S P (2013) Developing Fuzzy Enterprise Risk Management Maturity Model for Construction Firms. Journal of Construction Engineering and Management, 139(09), 1179–89.